Current Construction Projects
Heritage Park Subdivision (Job #J6004C)
The Heritage Park Subdivision is located near intersection of Pue Rd. and Raven Field and is a relocation of approx. 3,800 feet of water main and services that is being contracted by BexarMet. The project engineer is Jeffery C. Pollock, a BexarMet Infrastructure Engineer.
Project Type: City of San Antonio ___ Bexar County _X_ TXDOT __
BexarMet's Projected Start Date: October 2006
BexarMet's Projected End Date: December 15, 2006
Project Completion Status: 95% +
Projected In-House Cost: $350,000
Contractor: BexarMet
Please Call BexarMet at (210) 354-6500 with any questions you might have.
Memorial Lane and Hickory Hollow (L6002C)
The Memorial Lane and Hickory Hollow project is located bear intersection of Black Willow and Memorial Lane and is the building of a 6" Transmission Line and a 6" HDPE Pipe. The Memorial Lane and Hickory Hollow project is being contracted by BexarMet with John Joseph as the engineer on the project.
Project Type: City of San Antonio ___ Bexar County _X_ TXDOT __
BexarMet's Projected Start Date: November 8, 2006
BexarMet's Projected End Date: December 15, 2006
Project Completion Status: On-going
Projected In-House Cost: $102,168.50
Contractor: BexarMet
Please Call BexarMet at (210) 354-6500 with any questions you might have.
Quintana road (L60036)
The Quintana Road project is located at 807 Quintana Road and is the installation of approximately 466 linear feet of 12" ductile iron water pipe and 1 fire hydrant. This is an in-house project being contracted by BexarMet. The project Engineer is John Joseph, a District Engineer for BexarMet.
Project Type: City of San Antonio ___ Bexar County __ TXDOT __ BexarMet In-House _X_
BexarMet's Projected Start Date: Mid-December 2006
BexarMet's Projected End Date: Pending
Project Completion Status: On-going
Projected In-House Cost: $39,796.07
Contractor: BexarMet
Please Call BexarMet at (210) 354-6500 with any questions you might have.
Marney Plaza (J5006C)
The Marney Plaza project is located at Marney Plaza from Canavan to Burcham and is the installation of approximately 1,031 linear feet of 8" ductile iron water pipe. The Project Engineer for this project is John Joseph, District Area Engineer-South.
Project Type: City of San Antonio _X_ Bexar County __ TXDOT __
BexarMet's Projected Start Date: Pending
BexarMet's Projected End Date: Pending
Project Completion Status: On-going
Projected In-House Cost: $66,924.70
Contractor: BexarMet
Please Call BexarMet at (210) 354-6500 with any questions you might have.
Stevens Ranch Elevated Storage Tank (#U6178C)
The Steven Ranch Elevated Storage Tank Project is located north of intersection of TX211 and FM 1957. This project is the construction of a 2.5 million gallon composite elevated storage tank. The Contractor is Landmark Structures with Tom Pardue, District Area Engineer-Northwest, serving as the project engineer.
Project Type: City of San Antonio __ Bexar County __ TXDOT __ BexarMet _X_
BexarMet's Projected Start Date: January 2007
BexarMet's Projected End Date: 400 Days
Project Completion Status: On-going
Projected In-House Cost: $3,090,000
Contractor: Landmark Structures
Please Call BexarMet at (210) 354-6500 with any questions you might have.